Sign-offs & Compliance

Compliance records built in as you go, auditable and ready when needed

From design stage energy targets through to as-built sign off, Ubrix captures the evidence at every stage so nothing is missing at handover. Works the same way whether you are reporting to Part L in England, Section 6 in Scotland or BER requirements in Ireland.

Sign-offs and Compliance

Missing a single photo can hold up an entire handover.

Photographic evidence for energy compliance gets captured on phones, in shared drives and in email attachments, and half of it cannot be found when the compliance report is due. Whether you are working to Part L in England, Section 6 in Scotland or BER requirements in Ireland, the week before handover becomes a scramble, with site managers revisiting finished plots to redo evidence.

  • Energy compliance evidence captured in one place
  • No last minute scramble before handover
  • No revisits to redo missing photos
  • Compliance report ready on time

How it works

Every photo, every stage, already in the report.

01

Compliance requirements are set up per plot

Design stage energy targets and compliance evidence checklists are attached to each plot from the start, tailored to the house type.

02

Evidence is captured at each build stage

Site teams log photos and notes against each requirement in the Site App, so the record grows alongside the build.

03

The as-built report is ready to sign off

When handover is near, the Compliance report pulls together automatically with every photo, value and signature already in place.

Ready to stop scrambling for evidence at handover?

See how Ubrix captures stage evidence as the build happens, so the report is ready the moment you need it.