Cost calculator

What are disconnected systems costing you?

Move the sliders to match your business and see the yearly cost of moving each plot between systems, and how much of it one plot record gives back.

How does your team work today?
Average defects per plot
Disconnected systems a plot passes through Spreadsheets, inboxes, chat threads and department systems all count.

Nothing lost to fragmentation

With everything on one system there are no handoffs to lose time at. The savings here come from what Ubrix automates inside that record: reading and filing defect emails, routing jobs and chasing overdue work.

£0
saved every year with one plot record
-0% of today’s waste
0hrs / year
Time back for your team
£0per plot
Recovered on every plot
Recovered from manual intervention across sales, build, compliance and aftercare£0
Recovered from finding and reconciling information£0
Recovered from wasted and repeat visits£0

So, what’s next?

See the plot record behind these numbers in a thirty-minute walkthrough.

See Ubrix in action or speak with the team

Directional figures, excluding contractor costs. Assumes £35 per hour fully loaded team cost and £95 per wasted visit, based on UK construction averages. Anchored in FMI and Autodesk research: construction teams spend 35% of their time on non-productive work, including 5.5 hours per person per week searching for information. Savings reflect the duplicated administration, searching and wasted visits that disappear when a plot lives on one record. They do not assume Ubrix removes work that still needs a human.

How the numbers are worked out

Three costs: time spent moving each plot along by hand, time spent finding and reconciling information across systems, and wasted or repeat visits to site.

The research behind it comes from FMI and Autodesk: construction teams spend 35% of their time on non-productive work, including 5.5 hours per person per week searching for information. The model uses a £35 per hour fully loaded team cost and £95 per wasted visit.

The saving shown is the share Ubrix recovers: 65% of manual work, 65% of finding and reconciling, and 55% of wasted visits. Figures are a guide, exclude contractor costs, and are best checked by your finance team against your own numbers.

let's have a proper look.

Thirty minutes looking at Ubrix through your own developments, or a quick chat first if you'd rather.

Prefer the phone? 0191 716 6373 info@ubrix.co.uk