Sign-offs and Compliance

Evidence held against every plot, as you build.

Sign-offs, photos and documents held against every plot, ready when anyone asks.

FoundationsPre-plasterFirst fix electricsFinal inspection Plot 42Stage certificates 3 of 4 signed off

Ubrix holds stage sign-offs, photos and compliance documents against every plot as you build. Sign-offs are GPS-stamped with a named approver, and energy compliance evidence per plot is ready when an inspector, warranty provider or buyer asks for it.

  • Evidence as you go

    Photos and sign-offs captured at the stage, not hunted for later.

  • A name on every stage

    GPS-stamped, with the approver recorded.

  • Ready when asked

    The evidence for a plot, in one place, in seconds.

In the platform

Compliance across every development.

The Ubrix compliance dashboard with records by development and every plot's compliance stages

How it works

  1. Set the stages

    Your stages and evidence for each house type.

  2. Capture on site

    Photos and sign-offs in the Site App, offline if needed.

  3. Show it

    Every plot's evidence, ready for inspection or handover.

Questions

Questions people ask

Built for site managers, construction directors, technical managers and principal contractors.

Does Ubrix make a plot compliant?

No. Ubrix holds the evidence for each plot, so you can show what was done, by whom and when.

Does it work outside England?

Yes. Ubrix holds energy compliance evidence per plot wherever you build in the UK.

What if a stage is closed without a signature?

It is flagged for your team to review.

Last updated:

let's have a proper look.

Thirty minutes looking at Ubrix through your own developments, or a quick chat first if you'd rather.

Prefer the phone? 0191 716 6373 info@ubrix.co.uk