Sign-offs and Compliance
Evidence held against every plot, as you build.
Sign-offs, photos and documents held against every plot, ready when anyone asks.
Ubrix holds stage sign-offs, photos and compliance documents against every plot as you build. Sign-offs are GPS-stamped with a named approver, and energy compliance evidence per plot is ready when an inspector, warranty provider or buyer asks for it.
-
Evidence as you go
Photos and sign-offs captured at the stage, not hunted for later.
-
A name on every stage
GPS-stamped, with the approver recorded.
-
Ready when asked
The evidence for a plot, in one place, in seconds.
In the platform
Compliance across every development.
How it works
-
Set the stages
Your stages and evidence for each house type.
-
Capture on site
Photos and sign-offs in the Site App, offline if needed.
-
Show it
Every plot's evidence, ready for inspection or handover.
Questions
Questions people ask
Built for site managers, construction directors, technical managers and principal contractors.
Does Ubrix make a plot compliant?
No. Ubrix holds the evidence for each plot, so you can show what was done, by whom and when.
Does it work outside England?
Yes. Ubrix holds energy compliance evidence per plot wherever you build in the UK.
What if a stage is closed without a signature?
It is flagged for your team to review.
You might also like
All features- Site App Stages signed off on the plot with photos and a GPS stamp, even without signal.
- Smart FormsAI Describe the inspection you need and the form builds itself, or start from a template.
- Reporting and Integrations Live reports your board can read, with data flowing into the systems you already use.
Last updated:
let's have a proper look.
Thirty minutes looking at Ubrix through your own developments, or a quick chat first if you'd rather.
Prefer the phone? 0191 716 6373 info@ubrix.co.uk